UK site-work OS · faillist.co.uk

Survey. Fail list. Priced quote. Evidenced job.

If a firm still needs Excel, WhatsApp photos, or a separate quoting tool, we have failed. One Asset id through the loop. We do not certify a door or a seal — we record that a named person installed a named system, with evidence.

New organisations start on Pilot. Crew £99 or Company £249 a month — annual 10-for-12 available. Built to install on a phone.

Fail List

East wing · this week’s fail list

One Asset id per line

  • FD-003Intumescent seals damaged

    Quote line generated from the defect

    FAIL£186
  • FD-005Closer not latching

    Quote line generated from the defect

    FAIL£94
  • P-002Fire stopping missing

    Quote line generated from the defect

    QUOTED£420

One Asset id

Pin, photo, defect, quote line, job and evidence.

Priced from defects

The fail list becomes the quote. Not a second tool.

Close with photos

Jobs stay open until the remedy’s evidence is on the asset.

Not door-only

Fire doors, fire stopping, compartments, other site jobs.

The loop

How the work moves — without leaving the asset

Most firms still run a spreadsheet fail list, WhatsApp photo dumps, and a quote typed somewhere else. Fail List owns that gap: the survey becomes a priced fail list, then a job that cannot close without proof.

01

Survey the assets

Import or pin on the drawing. Coordinates stay normalised. The Asset id is the spine — not a row that dies in a spreadsheet.

Fail List

Level 2 drawing · pins at 0–1

FD-003 · P-002 · FD-005

The pin, photo, defect, quote line and evidence share the same Asset id.

02

Walk the fail list

A fail on the checklist is a defect with evidence. Failed red, quoted amber, complete green. WhatsApp is not the photo store.

Fail List

East wing · this week’s fail list

One Asset id per line

  • FD-003Intumescent seals damaged

    Quote line generated from the defect

    FAIL£186
  • FD-005Closer not latching

    Quote line generated from the defect

    FAIL£94
  • P-002Fire stopping missing

    Quote line generated from the defect

    QUOTED£420

03

Price from the defects

Inspect → fail list → priced quote is the happy path. Rate cards apply to the work the survey already found.

Fail List

Quote from defects · Issued

Priced fail list

Issued
FD-003 replace seals
£186.00
FD-005 closer
£94.00
P-002 fire stopping
£420.00

Issued → approve lines → create the job. Not typed from scratch.

04

Prove the job

Approve lines, run the job, close only when the required photos are on that same Asset id. Named people, named systems.

Fail List

Job FD-003 · cannot complete yet

Required evidence on the asset

  • After photo of seals
  • Leaf to frame gap

Named person, named system, photos the remedy requires. Not a certificate.

Fire-stopping and fire-door work on a UK site floor plate

Where the work usually dies

Spreadsheet. Chat photos. Quote elsewhere.

  • A fail list that is not the quote.
  • Evidence that is not on the asset.
  • A job marked complete because someone said so.
  • Handover as a folder of PDFs nobody can continue.

The Fail List path

Same id from the pin to the handover

  • Survey against the checklist on the asset.
  • Fail list priced from those defects.
  • Job that will not close without the remedy’s photos.
  • Living register as CSV or PDF — not a zip at the end.

Site photographs are atmosphere for the brand — not a customer’s job. Demo Fire in the seed is ours. We do not invent logos.

In the product today

The inspect–price–prove loop. Not the kitchen sink.

v1 does not claim timesheets, RAMS, BIM, accounting, or AI. It has to close the loop a contractor actually runs.

Drawings and pins

PDF drawings with overlay pins. Page, x and y in 0–1. Reload and they are still there.

Asset register

Fire door, fire stopping, compartment, or other site job. Fire-stopping assets can carry the product or system. QR and CSV when you already have a list.

Inspections that become defects

Checklists for fire doors and fire stopping. FAIL and OBSERVE create a defect with a photo, on the asset.

Quote → job lifecycle

Draft → Issued → approve lines → create the job. Priced from defects; issued quotes stay frozen.

Evidence standards

Each remedy defines the photos required. Jobs stay open until that set is on the same Asset id.

Assignees and My jobs

Assign tasks to people on the job. Operatives open My jobs for their list.

Shares and handover

Client and project register shares (revoke any time, no costs). Handover CSV or PDF of the living record.

PPM and multi-site

Recurring survey schedules with overdue flags. Portfolio view across sites for estates and FM.

Google and support tickets

Sign in with Google when it is enabled. Raise a ticket in the app and reply on the thread.

Three views, one database

Contractor, on site, client register — not three products to buy

Same records. Different work. The client does not get a zip of PDFs and a second subscription.

Contractor

Price the fail list and run evidenced jobs. Quotes, rates and close-out live here.

On site

Inspect on the phone, queue checks when signal drops, and build the fail list with photos. A fail becomes the quote — not a note to type up later.

Client register

Multi-site share of the living register with the estate or client. Same assets and fails — no prices or costs.

Organisation billing

Create an organisation. Walk the loop on your own jobs.

One organisation bill — Crew £99/month or £990/year, Company £249/month or £2,490/year, Estate on invoice — not per door and not a second quoting tool. Cancel or update the card in the Customer Portal. VAT is not added at checkout until Fail List has an active UK VAT registration.